Bolu State Hospital

╱ Health
╱ Architectural Design
╱ 2000
╱ Bolu
╱ 5000 m2
╱ German Red Cross commissioned 6 architects in their endeavor to build a prefabricated temporary hospital. Existing complex had een severely damaged due to earthquake in 1999 and a 100bed unit with 3 operation rooms got designed in three months, tendered and built in 4 months to follow to be opened for service not more than a year after the happenstance.6 years later when the main complex was fortified and was back in service, the annex got entitled as a psychiatric clinic.